PROJECT
“Development of the waste water infrastructure in Kavarna – Construction of the Main Collector VI and the adjacent sewage network”
Contractor: HIDROKAN LTD
Program: Project 58111-37-228. Operational Program “Environment 2007-2013”, Priority axis 1, Procedure №. BG161PO005/08/1.10/01/02 “Improvement and development of infrastructure for drinking and waste water”, co-financed by the European Development Fund and the Cohesion fund of the European Community.
Project development period: 2009.
Construction period: 2010-2012.
Phase: Technical design
The technical project consists of the following parts: Water Supply, Sewerage, Geology, Structures, Geodesy, Drainage, Roadway Restoration, Health and Safety Plan and Fire Safety.
The technical project consists of the following parts: Water Supply, Sewerage, Geology, Structures, Geodesy, Drainage, Roadway Restoration, Health and Safety Plan and Fire Safety.
Main collector VI and the adjacent sewerage network represents one neighborhood in Kavarna. Revision sewer manholes reinforced concrete.
Total length of the sewage network – 3.2 km.
Diameters from DN400 to DN1200
Types of sewer pipes used – PP (Polypropylene) and GRP (Glass Plastic Pipes).
Phase: Construction
Amount of the granted financial assistance: BGN 11,617,320 million. (€5,809,000).
Registration number: 58111-37-228
Name of beneficiary: Municipality of Kavarna
Year of completion of the site: 2012.
With the implementation of this project, 85% of the city’s population will have their sewers and water pipes replaced.